• Startup Pulse
    JohnAIC raises $1.9 million in a pre-seed funding round led by Crane Venture Partners, with participation from Neon Fund. Dreamteam Raises $53 Million to Take on Salesforce and HubSpot With AI Coworkers Deeptech Aerospace Startup Tessat Space Raises ₹1 Crore in Angel Funding Round from Xylapay Morsa raises $1.5 million in a pre-seed funding round led by Jackson Square Ventures, with participation from the a16z Scout Fund. Kutlerri.ai raises $4 million from Narahari Investments. JSW Ventures completes the first close of Fund III, with JSW Family Office as anchor investor. Desible.ai raises ₹32 crore in a funding round led by Prime Venture Partners, with participation from Invention Engine. mistEO raises ₹18 crore in a seed round led by MGF Kavachh, with Seafund and other investors participating. Astrome Technologies signs an agreement with the Technology Development Board for ₹64.05 crore in support through optionally convertible debt under the RDI Fund. Karta AI Raises INR 28.52 Crores in Seed Funding Round Led by Peer Capital and Cedar Hill Capital JohnAIC raises $1.9 million in a pre-seed funding round led by Crane Venture Partners, with participation from Neon Fund. Dreamteam Raises $53 Million to Take on Salesforce and HubSpot With AI Coworkers Deeptech Aerospace Startup Tessat Space Raises ₹1 Crore in Angel Funding Round from Xylapay Morsa raises $1.5 million in a pre-seed funding round led by Jackson Square Ventures, with participation from the a16z Scout Fund. Kutlerri.ai raises $4 million from Narahari Investments. JSW Ventures completes the first close of Fund III, with JSW Family Office as anchor investor. Desible.ai raises ₹32 crore in a funding round led by Prime Venture Partners, with participation from Invention Engine. mistEO raises ₹18 crore in a seed round led by MGF Kavachh, with Seafund and other investors participating. Astrome Technologies signs an agreement with the Technology Development Board for ₹64.05 crore in support through optionally convertible debt under the RDI Fund. Karta AI Raises INR 28.52 Crores in Seed Funding Round Led by Peer Capital and Cedar Hill Capital
  • Brahmaputra Underwater Road Rail Tunnel: Cabinet Clears Project Worth ₹18,662 Crore

    Brahmaputra Underwater Road Rail Tunnel

    New Delhi: The Brahmaputra Underwater Road Rail Tunnel project has received approval from the Cabinet Committee on Economic Affairs, chaired by Prime Minister Narendra Modi, for the construction of a major road-and-rail connectivity corridor in Assam.

    The project includes a 4-lane access-controlled greenfield highway from Gohpur on NH-15 to Numaligarh on NH-715, featuring a 15.79-km road-cum-rail tunnel beneath the Brahmaputra River.

    The project will be developed at a total capital cost of ₹18,662 crore under the Engineering Procurement Construction (EPC) model, with a total project length of 33.7 km.

    Brahmaputra Underwater Road Rail Tunnel to Transform Connectivity in Northeast

    At present, connectivity between Numaligarh on NH-715 and Gohpur on NH-15 spans approximately 240 km via the Kaliabhomora bridge near Silghat, requiring nearly six hours of travel through Numaligarh, Kaziranga National Park, and Biswanath.

    The new Brahmaputra Underwater Road Rail Tunnel project aims to significantly reduce travel distance and time while improving transportation efficiency.

    The government stated that this will be India’s first underwater road-cum-rail tunnel and the world’s second such infrastructure project.

    The project is expected to deliver substantial benefits to Arunachal Pradesh, Nagaland, and other northeastern states by improving freight movement, reducing logistics costs, and supporting socio-economic development across the region.

    Also Read: Inland Water Transport Network in India: IWDC 3.0 Approves Over INR 1,500 Crore Projects

    Multi-Modal Integration Across Road, Rail, and Logistics Networks

    The corridor will integrate with two major national highways – NH-15 and NH-715 – and connect with railway infrastructure under the Northeast Frontier Railway network. This includes:

    • Rangia–Mukongselek railway section under Rangia Division (Gohpur side)
    • Furkating–Mariani loop line section under Tinsukia Division (Numaligarh side)

    The project will enhance regional connectivity through integration with:

    • 11 economic nodes
    • 3 social nodes
    • 2 tourist nodes
    • 8 logistics nodes

    It will also provide connectivity to:

    • 4 major railway stations
    • 2 airports
    • 2 inland waterways

    This multi-modal infrastructure integration is expected to facilitate faster and more efficient movement of both passengers and goods across Assam and the Northeast.

    Economic and Strategic Impact

    Upon completion, the project is expected to play a key role in strengthening regional connectivity, enabling trade expansion, and supporting industrial development in Northeast India.

    The construction phase is projected to generate approximately 80 lakh person-days of direct and indirect employment, contributing to economic growth and development in surrounding regions.

    Also Read: Indian Railways Plans to Double Originating Train Capacity in 48 Major Cities by 2030

    Brahmaputra Underwater Road Rail Tunnel: Project Details

    FeatureDetails
    Project NameConstruction of Twin Tube TBM road Underwater tunnel 2 Lane each under River Brahmaputra along with provision of Railway infrastructure in one of the tubes, in the state of Assam on EPC Mode with total length of project as 33.7 Km.
    CorridorGohpur on NH-15 – Numaligarh on NH-715 
    Length (km)33.7 Km.
    Total Civil Cost (Rs Cr.)11,982.36 Cr.
    Land Acquisition Cost (Rs Cr.)716.65
    Total Capital Cost (Rs Cr.)18,662.02
    ModeEngineering Procurement Construction  (EPC).
    Project LengthInstant Project of Length 33.77 Km.
    Twin Tube TBM Tunnel with Railway in one of the tubes 15.79 Km.
    Total Road cut & cover1.26 Km.
    Total Rail cut & cover 4 Km.
    Major Roads ConnectedNational Highways – NH-15 & NH715 
    Rail Line connectedRangia-Mukongselek Railway Section under Rangia Division of NFR on Gohpur Side Furkating-Mariani loop line section under Tinsukia Division of NFR on Numaligarh side
    Economic / Social / Transport Nodes ConnectedAirports (02 ) : Dony Paulo Holongi Airport Itanagar and  Tezpur AirportRailway Stations (04) : Numaligarh Railway Station, Gohpur Railway Station, Golaghat Town Railway Station, Simaluguri JunctionInland Water way Terminals (02): Biswanath Ghat  Water way terminal, Tezpur Water way terminal Economic Nodes (11) : Numaligarh Industrial Area, Jorhat DIC, IIDC Titabor, Industrial Area Junakinagar, Industrial Estate Nagaon, IIDC Demow, Industrial Estate Sivasagar, IIDC Naltali, Industrial Area Dolabari, Mini Industrial Area Biswanath, MMLP Jogighopa.Social Nodes (03) : 1 Tribal district – Dima Hasao; 02 Aspirations Districts-Udalguri & DarrangTourist Nodes  (02) : Kaziranga National Park  & Deopahar Archaeological Site
    Major Cities / Towns ConnectedNumaligarh, Tezpur, Gohpur  Dibrugarh in Assam  & Itanagar In Arunachal Pradesh
    Employment Generation Potential80 Lakhs Man-Days of Direct & In-direct
    Annual Average Daily Traffic (AADT) in FY-25Estimated at 4680 Passenger Car Units (PCU)

    Author

    • Salil Urunkar

      Salil Urunkar is a senior journalist and the editorial mind behind Sahyadri Startups. With years of experience covering Pune’s entrepreneurial rise, he’s passionate about telling the real stories of founders, disruptors, and game-changers.

    Back to top